THE JUMPSUIT FOR BABY 0–3 MONTHS
Materials:
• circular needles 100 cm 4 mm ( US 6)
• double-pointed needles 4 mm (US 6) – 5 needles
• buttons
• markers
Yarn:
100–120 m (110–130 yds) in 50 g (1,75 oz) for wool yarn
Yarn examples: Alize Lanagold Classic, Alize Superlana Midi
Gauge: 16 stitches x 24 rows = 10 cm x 10 cm= 4 inches x 4 inches
Knitting process
Pick up 50 chain stitches by hook of the contrast yarn.
Pick up to circular needles 4 mm 45 stitches of the yarn of the white color from chain stitches, which crocheted by hook of the contrast yarn (see photo), then knit 2 rows – slip, K43, P1
K – knit stitch
P – purl stitch
Next begin the main pattern of jumpsuit
In 1 row of the main pattern you need to place markers for raglan:
— 7 stitches, marker, 2 stitches, marker, 4 stitches, marker, 2 stitches, marker, 15 stitches, marker, 2 stitches, marker, 4 stitches, marker, 2 stitches, marker, 7 stitches
Row 1: slip, K6 of the button band, K2 of raglan line, M1 (make increase 1 stitch), K4, M1, K2 of raglan line, M1, K15, M1, K2 of raglan line, M1, K4, M1, K2 of raglan line, K6 of the button band, P1
How to increase 1 stitch (M1) see on the photo
Row 2: slip, K49, P1 (51 stitches)
Row 3: slip, K6 of the button band, K2 of raglan line, M1, K6, M1, K2 of raglan line, M1, K17, M1, K2 of raglan line, M1, K6, M1, K2 of raglan line, K6 of the button band, P1
Row 4: slip, K55, P1 (57 stitches)
Row 5: slip, K6 of the button band, K2 of raglan line, M1, K8, M1, K2 of raglan line, M1, K19, M1, K2 of raglan line, M1, K8, M1, K2 of raglan line, K6 of the button band, P1
Row 6: slip, K61, P1 (63 stitches)
Row 7: slip, K6 of the button band, K2 of raglan line, M1, K10, M1, K2 of raglan line, M1, K21, M1, K2 of raglan line, M1, K10, M1, K2 of raglan line, K6 of the button band, P1
Row 8: slip, K67, P1 (69 stitches)
Row 9: slip, K6 of the button band, K2 of raglan line, M1, K12, M1, K2 of raglan line, M1, K23, M1, K2 of raglan line, M1, K12, M1, K2 of raglan line, K6 of the button band, P1
Row 10: slip, K73, P1 (75 stitches)
Row 11: slip, K6 of the button band, K2 of raglan line, M1, K14, M1, K2 of raglan line, M1, K25, M1, K2 of raglan line, M1, K14, M1, K2 of raglan line, K6 of the button band, P1
Row 12: slip, K79, P1 (81 stitches)
Row 13: slip, K6 of the button band, K2 of raglan line, M1, K16, M1, K2 of raglan line, M1, K27, M1, K2 of raglan line, M1, K16, M1, K2 of raglan line, K6 of the button band, P1
Row 14: slip, K85, P1 (87 stitches)
Row 15: slip, K6 of the button band, K2 of raglan line, M1, K18, M1, K2 of raglan line, M1, K29, M1, K2 of raglan line, M1, K18, M1, K2 of raglan line, K6 of the button band, P1
Row 16: slip, K91, P1 (93 stitches)
Row 17: slip, K6 of the button band, K2 of raglan line, M1, K20, M1, K2 of raglan line, M1, K31, M1, K2 of raglan line, M1, K20, M1, K2 of raglan line, K6 of the button band, P1
Row 18: slip, K97, P1 (99 stitches)
Row 19: slip, K6 of the button band, K2 of raglan line, M1, K22, M1, K2 of raglan line, M1, K33, M1, K2 of raglan line, M1, K22, M1, K2 of raglan line, K6 of the button band, P1
Row 20: slip, K103, P1 (105 stitches)
Row 21: slip, K6 of the button band, K2 of raglan line, M1, K24, M1, K2 of raglan line, M1, K35, M1, K2 of raglan line, M1, K24, M1, K2 of raglan line, K6 of the button band, P1
Row 22: slip, K109, P1 (111 stitches)
Next, we will knit elevation of the back.
Elevation of the back is done by working 4 additional rows.
Transfer to the right needle without knitting: 8 stitches of the left button band (7 stitches of the left button band +1 stitch of raglan = 7 stitches) and 28 stitches of the left sleeve (26 stitches of the left sleeve +2 stitches of raglan = 28) and take the yarn from another skein.
Row 1 of the elevation of the back: K1 from raglan line, K37, K1 from raglan line (all 39 stitches) – K39. Turn the work so the wrong side is facing.
Rows 2–4 of the elevation of the back: slip, K37, P1. Turn knitting.
Cut the yarn.
Transfer stitches of the left sleeve and the left button band back onto the left needle.
In 23 row begin to knit the body of jumpsuit (without sleeves):
Row 23: slip, K7 (6 stitches of the button band +1 stitches of raglan =7), transfer to the contrast yarn 28 stitches of the left sleeve (26 stitches of the left sleeve +2 stitches of raglan=28), K39 of the back of the jumpsuit (37 stitches of the back of the jumpsuit +2 stitches of raglan=39), transfer to the contrast yarn 28 stitches of the right sleeve (26 stitches of the sleeve +2 stitches of raglan=28), K7 of the button band, P1 (all 55 stitches on the circular needles 8+39+8=55)
Rows 24 – 74: slip, K53, P1
Then begin to knit the front side of baby jumpsuit.
Take circular needles 100 cm 4 mm (US 6) and the working yarn. Cast on 29 stitches.
Rows 1, 2: slip, K27, P1
Row 3: slip, K6, M1, K15, M1, K6, P1
Row 4: slip, K6, P1, K15, P1, K6, P1
In 5 row lets make buttonhole for buttons. In every 20 row – 5, 25, 45, 65 row.
Row 5: slip, K2, YO, K2tog, K2, M1, K17, M1, K3, YO, K2tog, K1, P1
YO – yarn over
K2tog – two knit stitches together
Row 6: slip, K6, P2, K15, P2, K6, P1
Row 7 slip, K6, M1, K19, M1, K6, P1
Row 8: slip, K6, P3, K15, P3, K6, P1
Row 9 slip, K6, M1, K21, M1, K6, P1
Row 10: slip, K6, P4, K15, P4, K6, P1
Row 11 slip, K6, M1, K23, M1, K6, P1
Row 12: slip, K7, P4, K15, P4, K7, P1
In 13 row doing the cross of braids. The cross of braids will do in every 6 row – in 13, 19, 25, 31, 37, 43, 49, 55, 61, 67, 73, 79 row and so on.
Row 13 slip, K6, M1, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, M1, K6, P1
Row 14: slip, K6, P1, K1, P4, K15, P4, K1, P1, K6, P1
Row 15 slip, K6, M1, K1, P1, K23, P1, K1, M1, K6, P1
Row 16: slip, K6, P2, K1, P4, K15, P4, K1, P2, K6, P1
Row 17 slip, K6, M1, K2, P1, K23, P1, K2, M1, K6, P1
Row 18: slip, K6, P3, K1, P4, K15, P4, K1, P3, K6, P1
Row 19 slip, K6, M1, K3, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, K3, M1, K6, P1
Row 20: slip, K6, P4, K1, P4, K15, P4, K1, P4, K6, P1
Row 21 slip, K6, M1, K4, P1, K23, P1, K4, M1, K6, P1
Row 22: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Row 23 slip, K11, P1, K23, P1, K11, P1
Row 24: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
In 25 row lets make second buttonholes for buttons.
Row 25 slip, K2, YO, K2tog, K3, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K4,YO, K2tog, K1, P1
Rows 26, 28, 30: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Rows 27, 29 slip, K11, P1, K23, P1, K11, P1
Row 31 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Rows 32, 34, 36: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Rows 33, 35 slip, K11, P1, K23, P1, K11, P1
Row 37 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Rows 38, 40, 42: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Rows 39, 41 slip, K11, P1, K23, P1, K11, P1
Row 43 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Row 44: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
In 45 row lets make third buttonholes for buttons.
Row 45 slip, K2, YO, K2tog, K7, P1, K23, P1, K8,YO, K2tog, K1, P1
Rows 26, 28, 30: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Rows 27, 29 slip, K11, P1, K23, P1, K11, P1
Rows 46, 48: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Row 47 slip, K11, P1, K23, P1, K11, P1
Row 49 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Rows 50, 52, 54: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Rows 51, 53: slip, K11, P1, K23, P1, K11, P1
Row 55 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Rows 56, 58, 60: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Rows 57, 59: slip, K11, P1, K23, P1, K11, P1
Row 61 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Rows 62, 64: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Row 63: slip, K11, P1, K23, P1, K11, P1
In 65 row lets make third buttonholes for buttons.
Row 65 slip, K2, YO, K2tog, K7, P1, K23, P1, K8,YO, K2tog, K1, P1
Row 66: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Row 67 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Rows 68, 70, 72: slip, K7, P4, K1, P4, K15, P4, K1, P4, K7, P1
Rows 69, 71: slip, K11, P1, K23, P1, K11, P1
Row 73 slip, K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K15, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7, P1
Row 74: slip, K7, P4, K1, P4, K15, P4,
In 75 row you need to put the button bands one on the other. 7 stitches from the right button band of the back side of jumpsuit you need to transfer on the cable needle (see photo). Then knit K2tog 7 times (one stitch from the cable needle and one stitch from the circular needle, there were 14 stitches, there will be 7 stitches).
then 35 stitches of the front side of jumpsuit on pattern: K5, P1, K23, P1, K5
then you need to put the button bands one on the other. 7 stitches from the left button band of the back side of jumpsuit you need to transfer on the cable needle (see photo). Then knit K2tog 7 times (one stitch from the cable needle and one stitch from the circular needle, there were 14 stitches, there will be 7 stitches).
then K41 of the back side of jumpsuit. (7+35+7+41 = 90 stitches).
Then you need to knit in the round.
Round 75 (beginning of row – right button band): K2tog 7 times, K5, P1, K23, P1, K5, K2tog 7 times, K41 (90 stitches)
Round 76 (beginning of row – right button band): P8, K4, P1, K4, P15, K4, P1, K4, P49
Then in the center of the front and back of the jumpsuit you need to place the markers (1 stitch between the markers)
24 stitches – red marker – 1 stitch – blue marker – 44 stitches – orange marker – 1 stitch – green marker – 20 stitches
Cut the yarn. Blue marker will be beginning of the next round.
Round 77: (after blue marker at the front of jumpsuit) K11, P1, K32, M1, K1, M1, K32, P1, K11, M1, K1, M1 (94 stitches)
Round 78: (after blue marker at the front of jumpsuit) P7, K4, P1, K4, P59, K4, P1, K4, P10
Round 79: (after blue marker at the front of jumpsuit) K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K28, M1, K3, M1, K28, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle K7, M1, K3, M1 (98 stitches)
Round 80: (after blue marker at the front of jumpsuit) P7, K4, P1, K4, P61, K4, P1, K4, P12
Round 81: (after blue marker at the front of jumpsuit) K11, P1, K32, M1, K5, M1, K32, P1, K11, M1, K5, M1 (102 stitches)
Round 82: (after blue marker at the front of jumpsuit) P7, K4, P1, K4, P63, K4, P1, K4, P14
Then transfer to the contrast yarn 58 stitches (44 stitches of the right leg +14 stitches between the legs) and knit the left leg on the five double pointed needles 4 mm on pattern in the round. There are 44 stitches for the left leg.
The left leg.
Round 1: K11, P1, K32
Round 2: P7, K4, P1, K4, P28
Round 3: K7, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K28
Round 4: P7, K4, P1, K4, P28
Round 5: K2tog, K9, P1, K30, K2tog (42 stitches)
Round 6: P6, K4, P1, K4, P27
Round 7: K10, P1, K31
Round 8: P6, K4, P1, K4, P27
Round 9: K6, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K27
Rounds 10, 12, 14: P6, K4, P1, K4, P27
Rounds 11, 13: K10, P1, K31
Round 15: K6, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K27
Rounds 16, 18, 20: P6, K4, P1, K4, P27
Rounds 17, 19: K10, P1, K31
Round 21: K2tog, K4, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K25, K2tog
Rounds 22, 24, 26: P5, K4, P1, K4, P26
Rounds 23, 25: K9, P1, K30
In 27 round begin to knit the ribbing – one knit stitch – one purl stitch (K1,P1). Knit the ribbing 16 rounds. Then bind off 40 stitches of the left sleeve. The left leg is ready.
Similary knit the right leg.
Transfer 7 sts of the front gusset and the 7 sts of the back gusset to waste yarn. Then transfer stitches of the right leg from waste yarn to the needle and knit the right leg on the five double pointed needles 4 mm (US 6) on pattern in the round. There are 44 stitches in the right leg.
The right leg.
Round 1: K32, P1, K11
Round 2: P28, K4, P1, K4, P7
Round 3: K28, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K7
Round 4: P28, K4, P1, K4, P7
Round 5: K2tog, K30, P1, K9, K2tog (42 stitches)
Round 6: P27, K4, P1, K4, P6
Round 7: K31, P1, K10
Round 8: P27, K4, P1, K4, P6
Round 9: K27, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K6
Rounds 10, 12, 14: P27, K4, P1, K4, P6
Rounds 11, 13: K31, P1, K10
Round 15: K27, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K6
Rounds 16, 18, 20: P27, K4, P1, K4, P6
Rounds 17, 19: K31, P1, K10
Round 21: K2tog, K25, 2 stitches slip on the cable needle, hold in back of work, K2, K2 from the cable needle, P1, 2 stitches slip on the cable needle, hold in front of work, K2, K2 from the cable needle, K4, K2tog
Rounds 22, 24, 26: P26, K4, P1, K4, P5
Rounds 23, 25: K30, P1, K9
In 27 round begin to knit the ribbing – one knit stitch – one purl stitch (K1,P1). Knit the ribbing 16 rounds. Then bind off 40 stitches of the right sleeve. The right leg is ready.
Then begin to knit the sleeves. Start knitting with the left sleeve. Knit in the round on five double pointed needles 4 mm (US 6). Return stitches from the waste yarn to the needle.
The left sleeve.
Round 1: pick up 2 stitches from underarm, knit 28 stitches of the left sleeve – K28, and pick up 4 stitches from the edge sts of the elevation of the back (2+28+4=34)
Rounds 2, 4: P34
Round 3: K34
Round 5: K2tog, K30, K2tog (32 stitches)
Rounds 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26: P32
Rounds 7, 9, 11, 13, 15, 17, 19, 21, 23, 25: K32
In 27 round – knit the ribbing – one knit stitch – one purl stitch (K1,P1).
Knit the ribbing 14 rounds. Then bind off 32 stitches of the left sleeve. The left sleeve is ready.
Similary knit the right sleeve.
The right sleeve.
Round 1: pick up 4 stitches from the edge sts of the elevation of the back, knit 28 stitches of the right sleeve – K28, pick up 2 stitches from underarm (4+28+2=34)
Rounds 2, 4: P34
Round 3: K34
Round 5: K2tog, K30, K2tog (32 stitches)
Rounds 6, 8, 10, 12, 14, 16, 18, 20, 22, 24, 26: P32
Rounds 7, 9, 11, 13, 15, 17, 19, 21, 23, 25: K32
In 27 round – knit the ribbing – one knit stitch – one purl stitch (K1,P1).
Knit the ribbing 14 rounds. Then bind off 32 stitches of the right sleeve. The right sleeve is ready.
Then remove the contrast yarn from the front and back gusset (opening between the legs) (see photo)
Then begin to knit the hood. Remove crochet chain, transfer 45 live stitches to the circular needles. Then knit 1 row – slip, K43, P1
Then you need to place markers:
— 22 stitches, marker, 1 stitch, marker, 22 stitches
The hood.
Row 1 of the hood: slip, K21, M1, K1, M1, K21, P1
Row 2 of the hood: slip, K45, P1
Row 3 of the hood: slip, K22, M1, K1, M1, K22, P1
Row 4 of the hood: slip, K47, P1
Row 5 of the hood: slip, K23, M1, K1, M1, K23, P1
Row 6 of the hood: slip, K49, P1
Row 7 of the hood: slip, K24, M1, K1, M1, K24, P1
Row 8 of the hood: slip, K51, P1
Row 9 of the hood: slip, K25, M1, K1, M1, K25,P1
Row 10 of the hood: slip, K53, P1
Row 11 of the hood: slip, K26, M1, K1, M1, K26, P1
Row 12 of the hood: slip, K55, P1
Row 13 of the hood: slip, K27, M1, K1, M1, K27, P1
Rows 14–54 of the hood: slip, K57, P1
Row 55: slip, K27, K2tog, then to bend the hood in half and sew the top of the hood using the Kitchener stitch.
Then pick up 54 stitches (see photo) and knit
Rows 1, 3, 5, 7, 9, 11, 13, 15, 17: slip, K52, P1
Rows 2, 4, 6, 8, 10, 12, 14, 16, 18: slip, P53
Then bind off 54 stitches, then to bend this in half and sew on the wrong side of the hood.
Then you need to knit a cord.
For knitting a cord use double pointed needles Cast on 3 sts. Slide stitches to other end of the needle.
Grab the working yarn (with yarn in back) and knit all sts in the row knitwise (through the front loop)
Slide stitches to other end of the needle again and knit a row. Repeat until the cord is about 90–100 cm (40 in) long.
Need to wash baby jumpsuit and dry. Sew buttons. The baby jumpsuit is ready.
THE JUMPSUIT FOR BABY 0–3 MONTHS
Materials:
• circular needles 100 cm 4 mm ( US 6)
• double-pointed needles 4 mm (US 6) – 5 needles
• buttons
• markers
Yarn:
100–120 m (110–130 yds) in 50 g (1,75 oz) for wool yarn
Yarn examples: Alize Lanagold Classic, Alize Superlana Midi
Gauge: 16 stitches x 24 rows = 10 cm x 10 cm= 4 inches x 4 inches
Knitting process
1. Knitting neckband for ribbing
Take circular needles 100 cm 4 mm (US 6) and the working yarn. Cast on 45 stitches. Knit 6 rows for 1x1 ribbing (K1, P1) (knit back and forth):
Rows 1, 3, 5: slip, (K1, P1) – repeat 22 times
Rows 2, 4, 6: slip, (P1, K1) – repeat 21 times, P2
K – knit stitch
P –purl stitch
2. Decorating neckband
Row 1: slip, (K1, YO to yourself) – repeat 43 times, P1
Rows 2–5: slip, (K1, slip the purl st with yarn in front) – repeat 45 times, P1
Row 6: slip, (K2tog) –– repeat 43 times, P1
Next begin the main pattern of jumpsuit.
In 1 row of the main pattern you need to place markers for raglan:
— 7 stitches, marker, 2 stitches, marker, 4 stitches, marker, 2 stitches, marker, 15 stitches, marker, 2 stitches, marker, 4 stitches, marker, 2 stitches, marker, 7 stitches
Row 1: slip, K6 of the button band, K2 of raglan line, M1 (make increase 1 stitch), K4, M1, K2 of raglan line, M1, K15, M1, K2 of raglan line, M1, K4, M1, K2 of raglan line, K6 of the button band, P1
How to increase 1 stitch (M1) see on the photo
Бесплатный фрагмент закончился.
Купите книгу, чтобы продолжить чтение.